Bond: QAR 1,000,000/–
Issue Date:11/01/2010
Bid Closing Date:
7-Mar-2010 11:00 hrs Local (GMT +0300)
Location:
Contracts Dept. – Operations Division, Qatar Petroleum, PO Box 3212, Royal Plaza,G Wing,4th Floor Rm G13,Doha
Fee: QAR 500
Bond Validity:
04/08/2010 – (150) days from the Bid Closing Date
Offer Validity:
05/07/2010 – (120) days from the Bid Closing Date
Scope of Work/Description:
POWERED WATER INJECTION FLOWLINES MANTENANCE ON CALL-OFF basis @ DUKHAN CONTRACTOR’s Scope of Services includes replacement of corroded pipeline sections, painting, installation of HDPE liner, repositioning, supply and installation of new pipeline supports where necessary. For the buried spurline sections the road/track crossings have to be diverted to excavate existing pipes for inspection and to relocoate, if required, and roads to be re-instated